- TUG BOATS:-
02000 - 5000... GRT = 1 TUG
05001 - UP TO GRT. = 2 TUG
FOR DORTYOL TERMINALS
- MOORING TO SEA BUOYS:-
VESSEL WILL FIRST DROP STB ANCHOR
AND THAN BE TO BE CONNECTED TO THE SEA BUOYS.
- SEA BUOYS LOCATED AT:-
ONE BUOY'S PORT SIDE FWD
THREE BUOYS AT AFT (STB/CENTER/PORT SIDE)
3 OR 4 MOORING LINES AT AFT EACH BUOY.
LENGHT OF EACH MOORING LINES SHOULD BE MIN ABT 100 MTRS
- HOSE:-
FOR LPG MIX CARGO.. : 1 X 8 " 300 ASA
FOR PROPANE CARGO : 1 X 8 " 300 ASA
A MID - SHIP PORTSIDE LOADING / UNLOADING
HOSE'S WILL BE TAKE PLACE ON VSL'S PORT SIDE,
NEED SWL 3,5 TONS.
SPERATE HOSES WILL BE CONNECTED
FOR LPG MIXTURE AND PROPANE.
-DISCHARGE:- FOR LPG MIXTURE
BY LINE BLENDING FOR LPG MIXTURE
TEMPERATURE : ABT MIN -13 / MAX - 5 DEG C
PRESSURE.......: ABT MAX 10 KG/M2
RATE............ .: ABT MIN 250 MT/ MAX 450 MT.
- LPG MIX UNDERWATER PIPELINE:-
1 X 14"/ABT 2300 M. FM SHORE TANKS TO HOSE
IPRAGAZ LOADING MASTER WILL ADVISE TO VSL
MASTER DISCHARGING OPERATION.
VSL MASTER WILL ADVISE TO LOCAL AGENT
ALL VSL DETAILS.(VSL MANIFOLD,ETC) BEFORE ARRIVAL DORTYOL.
-DISCHARGE:- FOR PROPANE
TEMPERATURE : ABT MIN -10 / MAX - 5 DEG C
PRESSURE... ...: ABT MAX - 10 KG/M2
RATE........... ..: ABT MIN 150 MT / MAX 250 MT. |